Wednesday, 8 August 2012

The container


After the departure of team A it started as normal, however after tenses (our elevenses), Jackie asked Mark and I if we could help Chris with the container! :D We obviously said yes and the adventure began with a journey in Plastic’s truck.  30 mins later we arrived at the holding place to find all the contents of the container lying beside it.  We then watch as they tried to lift the empty container with two fork lifts both on the same side!  It looked as if it was about to fall over! : (  After 20 mins they decided to put a fork lift at each side of the back of the container and a crane at the front to lift the container onto another lorry.  Afterwards the truck driver only let us refill half the container as it was supposedly too heavy so a van and two of our pickup trucks had to make two journeys to move the remaining equipment to site.  They left three Botswanans, Off-t, Moses and Jackson as well as Mark and me to watch the equipment left for the second run.  When we got back to site we only had time to refill the container before darkness.  This meant the next day was spent emptying and repacking the container again!!


Mark Vale and Dobbie